Skip to main content
Klíma Doki
  • Home
  • Services
  • Contact
  • References
  • Price list
  • Air conditioners
  • Blog
  • Legal notice and terms of use
  • HUN
  • DEU
  • ENG

Recent Posts

  • General air conditioner installation
    2025. Jul 30.
  • Air conditioner maintenance
    2025. Jul 30.
  • Air conditioner energy consumption
    2025. Jul 30.

General air conditioner installation

July 30, 2025 at 1:16 am, No comments

GENERAL AIR CONDITIONER INSTALLATION:

PREPARATION

  • Our team and the ordered air conditioner, if it was ordered from us, arrive at the site at the agreed time.
  • If you accept our quotation, we arrange an installation appointment.

INSTALLATION

  • We inspect the site, after which our colleagues send a written quotation.
  • We measure the indoor unit at the designated location, secure it properly and make the 55 mm opening required for the air-conditioning pipework.
  • We confirm the outdoor unit location, install the bracket and secure the outdoor unit.
  • If required, we install cable channels or wall chases and connect the air-conditioning pipework and control cables.
  • Pressure test with high-purity nitrogen.
  • Evacuation and vacuum hold test.
  • Commissioning.

HANDOVER

  • The installers inform the customer that the work is complete.
  • They demonstrate the indoor and outdoor units in operation and explain the basic operating rules.
  • After successful handover, they provide the equipment documentation.

No comments

Leave a reply







Cart

Cart is empty.

Phone: 06/20-940-49-30
Email: [email protected]